Contractor

An expedited construction schedule often times leads to an increase in profit. The real world presents construction restraints that are sometimes missed in the design phase of a project leaving the contractor to provide a solution.

The 3D Advantage

  • Identify conflicts between design and existing conditions
  • Quantity verifications
  • Clash detection
  • Offsite fabrication of parts
  • Seamless assembly
  • Improved anchor bolt location accuracy
  • Quality control
  • Space efficiency concerns
  • Comparison of as-built to as-designed
  • Constructability logistics

Learn how PVT can help you.